This week, the group is focusing on a strict schedule created during Week 8 for the remaining deliverables of the project. Figure 8.1 below shows the planned progress of task completion for the group, as well as other important deadlines to keep in mind.
 |
Figure 8.1: The calendar for the group's remaining milestones.
|
As well, the group is working individually on assigned parts of the final report, while certain members will be putting the presentation slides together. Figure 8.2 describes the various roles of each member.
 |
Figure 8.2: Roles for the breakdown of the final report and the PowerPoint presentation. |
|
Additionally, Pro/ENGINEER designs were completed for the suit and its interior. These illustrate some changes to the overall design in the way the tube network spreads out within the suit; a more structured and organized layout was used. Figure 8.3 shows some screenshots from Pro/ENGINEER, at various angles to emphasize the different parts of the design.
 |
Figure 8.3: The new design created in Pro/ENGINEER. This differs from the previous sketches in the way the tubes run throughout the inner suit layer. |